Evaluation of the potential for containment bypass due to steam generator tube rupture in VVER-1000/V320 reactor during extended SBO sequence using SCDAP/RELAP5 code
Nuclear Science and Technology, Vol.9, No. 4 (2019), pp. 09-15
Evaluation of the Potential for Containment Bypass due to
Steam Generator Tube Rupture in VVER-1000/V320 Reactor
during Extended SBO sequence using SCDAP/RELAP5 code
Nguyen Van Thai1,*, Doan Manh Long2, Tran Chi Thanh2
1 Department of Nuclear Engineering and Environmental Physics, School of Engineering Physics,
Hanoi University of Science and Technology
2 Vietnam Atomic Energy Institute
(Received 05 November 2019, accepted 30 December 2019)
Abstract: A severe accident-induced of a Steam Generator (SG) tube releases radioactivity from
the Reactor Coolant System (RCS) into the SG secondary coolant system from where it may escape
to the environment through the pressure relief valves and an environmental release in this manner is
called “Containment Bypass”. This study aims to evaluate the potential for “Containment Bypass”
in VVER/V320 reactor during extended Station Blackout (SBO) scenarios that challenge the tubes
by primarily involving a natural circulation of superheated steam inside the piping loop and then
induce creep rupture tube failure. Assessments are made of SCDAP/RELAP5 code capabilities for
predicting the plant behavior during an SBO event and estimates are made of the uncertainties
associated with the SCDAP/RELAP5 predictions for key fluid and components condition and for
the SG tube failure margins.
Keywords: Containment Bypass, SBO, SCDAP/RELAP5.
failure of steam generator tubes prior to the
failure of one of other components (hot leg
piping, pressurizer surge-line piping, and the
reactor vessel) leads to discharge of some
fission products into the steam generator
secondary system from where they may be
discharged to the environment through the
pressure-relief valves. This sequence is
potentially more risk-significant since it
involves a containment bypass scenario. The
relative timing of these structural failures
therefore affects the event sequence and
whether the containment is bypassed.
I. INTRODUCTION
In 1990s, U.S. Nuclear Regulatory
Commission (NRC) and the Russian Federal
Nuclear and Radiation Safety Authority
Gosatomnadzor (GAN) agreed to work
together in BETA Project to perform a
probabilistic risk assessment (PRA) of Unit I
of the Kalinin Nuclear Power Station (KNPS),
which is a VVER1000/V-338. Analysis within
the BETA Project involves different levels of a
wide-scope PRA and the PRA model
represents the set of accident sequences
following the initial events (IEs) up to the end
state of each sequence. The reports indicated
that the most significant release category for
offsite consequences is containment failure as a
result of an IE with a leak from the primary to
the secondary circuit [1]. In this aspect, steam
generator tubes comprise a majority of the
reactor coolant system pressure boundary and
This paper present thermal-hydraulic
evaluations of VVER-1000/V-320 during
extended
SBO
event
using
the
SCDAP/RELAP5 systems analysis code. In
general, the design features of VVER-1000/V-
338 are similar to the standard VVER-1000/V-
320, excepted of the main circulation loops
©2019 Vietnam Atomic Energy Society and Vietnam Atomic Energy Institute
EVALUATION OF THE POTENTIAL FOR CONTAINMENT BYPASS DUE TO STEAM…
configuration which is equipped with main
gate valves on the cold and hot legs (CLs and
HLs) [2]. The potential for “Containment
Bypass” is associated with natural circulation
of superheated steam inside the piping loop
that might induce creep rupture tube failure.
SCDAP/RELAP5 predictions provide key fluid
and components condition for estimation of the
SG tube failure margins.
The turbine-driven auxiliary feedwater
(TDAFW) system is assumed to independently
fail, so no MFW or auxiliary feedwater (AFW)
system is available;
A station battery life of four hours is
assumed; after that time all automatic and
operator control of the pressurizer PORVs and
SG secondary system PORVs is lost;
During the initial portion of the accident
scenario, buoyancy-driven coolant-loop natural
circulation carries hot water from the core
through the SGs, transferring heat to the SG
secondary water inventory. The SG water
inventory is boiled and the steam is released
through the SG PORVs. The secondary water
inventory declines and is eventually fully
depleted since the MFW and AFW systems are
not operative. After that time, the core decay
power heats and swells the RCS water,
increasing its temperature and pressure. The
basic physical processes during this regard the
transport of hot steam from the core outward
into the other regions of the reactor vessel
(RV) and coolant loops. Two coolant loop
natural circulation flow patterns that may be
encountered subsequent to the uncovering and
heat-up of the reactor core, based upon whether
or not the loop seals (the cold leg piping
connecting the outlets of the SGs to the inlets
of the RCPs) remain liquid-plugged.
II. DESCRIPTIONS OF ACCIDENT
SCENARIO AND PLANT BEHAVIOR
The low-probability SBO base case
accident event scenario results in a severe
accident because none of the systems that
normally provide core cooling are assumed to
be operable nor is any alternate equipment
(e.g., security-related mitigation methods)
assumed to be available [4]. The accident event
is initiated by a loss of off-site alternating
current (AC) power, which immediately results
in reactor and turbine trips and the coast-down
of the four reactor coolant pumps (RCPs).
Also, assumptions are made as follows:
The diesel-electric generators fail to
start and all AC power sources are lost;
Letdown flow is isolated and the
pressurizer level control and RCP seal injection
functions of the charging system are lost;
The high-pressure and low-pressure
safety injection systems are unavailable as a
result of the AC power loss;
If liquid is cleared from a loop seal
(along with the region of the RV lower plenum
that extends above the bottom of the core
barrel, the "downcomer skirt"), hot steam is
transported from the core through the HL, SG
tubes and cold legs in the normal direction of
flow (i.e., that seen during plant operation).
This flow pattern transports the hot steam
directly (without benefit of mixing) through all
of the SG tubes, leading to SG tube failure
The accumulator systems (four HAs)
are available for injecting coolant into the cold
legs should the RCS pressure fall below the
initial accumulator pressure, 5.9 MPa;
The main feedwater (MFW) flow stops
and the motor-driven auxiliary feedwater
(MDAFW) system is unavailable as a result of
the AC power loss;
10
NGUYEN VAN THAI et al.
prior to HL or pressurizer surge line failure.
However, if a loop seal remains liquid-
plugged, the more complex flow pattern
develops instead. Hot steam is transported
through the upper portion of the HL cross
section to the SG inlet plenum, where it is
mixed with cooler steam emanating from
circulations set up within the SGs, with some
of the tubes flowing in the normal direction
and the remaining tubes flowing in the reverse
direction. The mixing process within the SG
inlet plenum determines the temperatures of
the steam entering the SG tubes and the steam
that is returned to the RV through the lower
portion of the HL cross section. Fluid mixing
in the SG inlet plenum buffers the entry of hot
steam into the SG tubes, thus delaying SG tube
failure and making it more likely that some
other component (HL, pressurizer surge line or
RV) will be the first to fail.
The issues of primary interest for
containment bypass are: (1) do the loop seals in
all coolant loops remain liquid plugged and if
so (2) does the fluid mixing in the SG inlet
plenum sufficiently slow the SG tube heat-up
process so that the HL, pressurizer surge line
or RV will fail prior to a SG tube? [4]. The
analyses in this paper address these issues.
Fig. 1. RCS Layout of VVER-100/V-320 [3]
TURBINE
196
194
MSIV
187
MSIV
287
MSIV
387
MSIV
487
186
286
386
486
490
190
489
BRU-A1
189
BRU-A1
182
184
484
482
REG
REG
REG
REG
180
BRU-In1
191
BRU-In1
491
192
Valve Valve Valve Valve
185 285 385 485
492
480
Steam
dome
Steam
dome
169
168
167
469
468
467
Separator
Separator
Volume above
perforated sheets
Volume above
perforated sheets
508
177
477
ACC
ACC
ACC
ACC
152
452
PORV
Volume between
tube bundles and
perforated sheets
Volume between
tube bundles and
perforated sheets
506
511
466
176
175
174
136
166
125
124
123
122
121
116
416
415
414
413
412
411
410
436
435
476
JNG80
JNG60
087
JNG70
088
JNG50
086
165
115
465
464
463
462
461
425
424
423
179
178
173
172
171
135
134
133
479 475
089
164
114
434
433
432
431
430
478
473
474
504
450
150
163
113
162
112
422
421
132
131
130
472
471
161
111
502
110
56
54
100
400
3
102
61-62
1-2
49-50
45-48
41-44
51-52
63-64
3-4
402
8
7
4
3
2
1
1
2
4
142
144
5-6
7-8
444
442
141
441
11
1
11
36
37-40
9
9
9-11
30 32 33 31
26 28 29 27
10-12
34
4
1
2
3
1
6
6
9
8
7
6
5
2
3
3
140
440
35
4
3
2
1
1
1
4
2
1
4
5
6
23-25
22-24
18-20
5
6
19-21
15-17
14-16
Fig. 2. Nodalization scheme of VVER-1000/V-320 Plant
11
EVALUATION OF THE POTENTIAL FOR CONTAINMENT BYPASS DUE TO STEAM…
zero, the structure has not experienced any
creep damage. If the value is one, the structure
has failed due to creep damage. Two different
theories (Larson Miller and Manson-Haferd)
are applied in SCDAP/RELAP5 which are
dependent upon the structural materials and the
range of stress and summarized in Table I.
III. PLANT NODALIZATION AND
PARAMETERS SETUP WITH
SCDAP/RELAP5
The SCDAP/RELAP5 computer code
calculates the overall RCS thermal-hydraulic
response for severe accident situations that
include core damage progression and RV heat-
up and damage. The computer code is the result
of a merging of the RELAP5 and SCDAP
computer codes. Prediction of structural failure
are made based on the structure configuration,
its material properties and the fluid conditions
that are locally present. The code also includes
models for calculating the creepture failure of
structural components and these are used to
predict failure time for the hot legs, pressurizer
surge line, and SG tubes [5].
Table I. Equations for the time to creep rupture [5]
Since SG tubes are made from heat-
resistant steel (08X18H10T) which is similar to
heat-resistant Stainless Steel, equations for
creep rupture time of 316 Stainless Steel in
Table i are selected in this study. Estimated
stress in SG tubes (cylindrical shaped
structure) is calculated as follows:
The
SCDAP/RELAP5
VVER-
1000/V320 plant model represents the fluid
volumes and structures in the core, RV and
primary and secondary coolant system regions
in the plant as shown in Fig 1. The nodalization
diagrams for the final SCDAP/RELAP5
VVER-1000/V-320 four-loop plant model are
provided in Fig. 2.
(P r P ro )
i
rio rio
(2)
In this work, creep rupture failure
calculations are performed for the hot average SG
tubes in which pressure and temperature
conditions of fluid and heat structures in four SGs
are used as inputs for the analyses. A parameter
that measure creep damage is calculated each time
step for each structure being monitored for creep
rupture by following equation:
Fig. 3. Model ofSG ubes
IV. RESULTS AND DISCUSSION
A. Plant behaviors
t
Dc
t t
Dc
t
(1)
tr
t
The SCDAP/RELAP5 plant model was
run to a steady solution. The plant model using
the nodalization scheme to establish full-power
steady-state conditions from which the SBO
transient accident sequence is initiated
(Figures.4&5).
Where Dc
problem time t, t is time step at current
problem time and tr is time required for the
t
is creep damage at
t
structure to fail by creep rupture at current state
of temperature and stress. If the value of Dc is
12
NGUYEN VAN THAI et al.
Fig. 4. Steady-state conditions (Pressure) at primary
Fig. 6. Transient condition of reactor power and
and secondary loops
pressure in PRZ
Fig. 7. Transient condition of mass flow rate
through the primary loops and SG levels
Fig. 5. Steady-state conditions (Mass Flow Rate
and Temperature) at primary and secondary loops
Buoyancy-driven coolant-loop natural
circulation carries hot water from the core
through the SGs, transferring heat to the SG
secondary water inventory until the SG heat
sink is lost around 11000s (Fig. 7). It can be
seen that after the SG heat sink is lost, the
pressure the cooling afforded by system heat
loss to containment and RCP shaft seal leak
flow is insufficient to remove the RCS heat
load, causing the RCS and PRZ pressure to
increase (Fig. 6). After SG dry-out, the RCS
pressure increase is limited by multiple cycling
of the PORVs and by two cycles of the SRVs
during the period with the most-challenging
RCS pressurization conditions. This challenge
The SBO base case event sequence was
simulated with SCDAP/RELAP5, starting from
time 250s when the loss of off-site power
occurs. Figure 5 showed the transient condition
of reactor power and pressure level in PRZ.
After a short period when the PRZ
pressure initially falls and rises slightly due to
the effects of the reactor and turbine trips, the
PRZ pressure declines in response to the
cooling provided by heat removed to the SGs.
The RCS fluid mass lost through the
pressurizer PORVs and SRVs and through the
RCP shaft seal leakage paths depletes the
RCS inventory.
13
EVALUATION OF THE POTENTIAL FOR CONTAINMENT BYPASS DUE TO STEAM…
is presented when the increasing temperatures
cause the RCS fluid to swell, completely filling
the pressurizer with water. The fuel
temperature increases after the heat sink is lost
and the onset of fuel rod oxidation as well as
fuel rod cladding rupture occurred as an
unvoidable consequence (Fig. 8).
occur after the time when SG tube structural
failures is experienced.
Fig. 9. Structure temperature and creep
damage index
V. CONCLUSIONS
The
paper
presents
preliminary
Fig. 8. Temperature of fuel pins and hot legs
assessments the VVER-1000/V-320 plant
behavior during an SBO event with the
SCDAP/RELAP5 for key fluid and
components condition and for the SG tube
failure margins. Further analyses will be
performed to evaluate the potential for
“Containment Bypass” in VVER-1000/V-320
reactor during extended Station Blackout
(SBO) scenarios.
B. Creep Rupture Analysis of SG Tubes
Creep rupture model allows one to
specify a "stress multiplier" in following
meaning: a multiplier of 1.0 provides a creep
rupture failure prediction based on no
degradation of the structural strength of the
material and multipliers greater than 1.0
represent degraded structural strengths. In this
study, a stress multiplier from 1.0 to 5.0 (in
increments of 0.1) are used for SG tube
rupture prediction to investigate the spectrum
of material strengths, from undergraded to
highly-degraded.
ACKNOWLEGEMENTS
This work was supported by the
Ministry of Science and Technology (MOST)
R&D Project with contract number
05/HĐ/ĐTCB signed on 05/01/2018.
Typical results on Larson-Miller creep
rupture damage index for the hottest SG tubes
is presented in Fig. 9. It was found that the
average-tube predicted failure margin is 2.3
and the hottest-tube predicted failure margin is
1.7. Also, SG tube failure margin are
insensitive to variations in the fuel damage
progression behavior primarily because these
.REFERENCES
[1]. Federal Nuclear and Radiation Safety
Authority of the Russian Federation, Kalinin
VVER-1000 Nuclear Power Station Unit 1
PRA (Beta Project), NUREG/IA-0212,
published by US NRC, 1992.
14
NGUYEN VAN THAI et al.
[2]. Design, Safety Technology and Operability
Features of Advanced VVERs, OKB
“GIDROPRESS’’, 2011.
[4]. C.D., Fletcher et al. SCDAP/RELAP5 Thermal-
Hydraulic Evaluations of the Potential for
Containment Bypass During Extended Station
Blackout Severe Accident Sequences in a
Westinghouse Four-Loop PWR. NUREG/CR-
6995, published by US NRC, 2010.
[3]. S.,
Pylev.
Assessment
Study
of
RELAP5/MOD3.2 Based on the Kalinin NPP
Unit-1 Stop of Feedwater Supply to the Steam
Generator No. 4, NUREG/IA-0167, published
by US NRC, 1999.
[5]. C. Allison et al., “SCDAP/RELAP5/MOD2
Code Manual”, Volume: I, II and III,
NUREG/CR-5237, EGG-2555, June 1989.
15
Bạn đang xem tài liệu "Evaluation of the potential for containment bypass due to steam generator tube rupture in VVER-1000/V320 reactor during extended SBO sequence using SCDAP/RELAP5 code", để tải tài liệu gốc về máy hãy click vào nút Download ở trên
File đính kèm:
evaluation_of_the_potential_for_containment_bypass_due_to_st.pdf